ITU-R WP5D Brazil Meeting: Complete IMT 2020 RIT/SRITs from 3GPP, China & Korea advance; Nufront submits new EUHT RIT

SOURCE: Meeting Report of ITU-R WP5D Working Group on Technology Aspects (17 July 2019)

IMT-2020 RIT/SRITs:

This past week’s 32nd meeting of ITU-R WP 5D in Brazil was a milestone for the IMT-2020 process described in Document IMT 2020/2(Rev.1): Step 3 – submission / reception of the RIT and SRIT proposals and acknowledgement of receipt.

Seven submissions of candidate IMT-2020 RIT/SRITs were received at this meeting.  Importantly, some were updates to their previous submissions.

  1. 3GPP – RIT
  2. 3GPP  -SRIT
  3. China (People’s Republic of)
  4. South Korea (Republic of)
  5. ETSI (TC DECT) and DECT Forum
  6. TSDSI (India)
  7. Nufront [1]

Note 1. At this week’s ITU-R WP5D meeting in Brazil, Nufront (Beijing) Technology Co. Ltd (Nufront) proposed ‘EUHTRIT as the candidate IMT-2020 radio interface technology. The Nufront new candidate RIT is in addition to the RIT/SRITs previously input by 3GPP, China, South Korea, TSDSI (India), ETSI/DECT Forum.

Nufront provided the characteristics template, link budget template, compliance template, and self-evaluation report of the EUHT RIT. The submission templates follow the ITU-R IMT-2020 submission format and guidelines as defined in Report ITU‑R M.2411.

–>Please refer to my Comment in the box below this article.  It provides background on motivation for Nufront’s EUHT RIT proposal and their (failed) attempt to get IEEE 802.11AX to be included as either a merged RIT or a SRITs.

…………………………………………………………………………………………………………………………………………………………………………………..

After review of all the submissions (see Table 1. below) under the IMT-2020 process Step 3 (the cut off date for submissions of candidate IMT 2020 RIT/SRITs), the meeting determined that the submissions from 3GPP (SRIT and RIT), China and Korea are “complete” per section 5 of Report ITU-R M.2411.  Therefore, they fulfilled the requirements for submission in Step 3 of the IMT-2020 process.

The meeting is of the view that, the supplied self-evaluation and any amendments accepted during this meeting for the submissions of ETSI (TC DECT) and DECT Forum (the component RIT DECT-2020 NR), Nufront and TSDSI do not yet permit WP 5D to determine if a complete and satisfactory self-evaluation as required by the IMT-2020 process has been fully provided.

A way forward for these submissions has been agreed by the meeting (Doc. 5D/TEMP/778-only available to those who have a TIES account). The Proponents should provide the full details requested in the process and in the specifically defined way to WP 5D, considering the comments raised in this meeting, in order for WP 5D to proceed further in the process with the submissions.

A decision on the submission above shall be taken in 33rd meeting WP 5D in December 2019.
For convenience, these submitted proposals are also posted on the “Web page for IMT-2020 submission and evaluation process.”

Under the IMT-2020 submission and evaluation process, the ITU-R will now proceed with the detailed evaluation of the proposed candidate technologies until 34th meeting of WP 5D in February 2020.

Table 1. Candidate RIT/SRIT Submissions from 3GPP, China, Korea, ETSI and DECT Forum, Nufront and TSDSI:

Seven submissions of candidate IMT-2020 RIT/SRITs were received at this meeting; some were updates to their previous submissions.

Table 3.4.3.A  (documents listed are only available to those who have a TIES account with itu.int)

RIT/SRIT Proponent Candidate Technology Submission
3GPP – SRIT Docs. 5D/1215 and 5D/1216
3GPP – RIT Docs. 5D/1215 and 5D/1217
China (People’s Republic of) Doc. 5D/1268
Korea (Republic of) Doc. 5D/1233
ETSI (TC DECT) and DECT Forum Docs. 5D/1230 and 5D/1253
Nufront Doc. 5D/1238
TSDSI Doc. 5D/1231

………………………………………………………………………………………………………………………………………………………………………………………….

IMT-2020/VVV:

The meeting agreed to complete this document (IMT-2020/VVV) at this meeting, rather than the original plan of the #34 meeting. During development of the document, it was agreed to follow the approach adopted by WP 5D for the development of IMT-Advanced (aka “LTE Advanced).

The finalized new IMT-2020/VVV document on “Process and use of the Global Core Specification (GCS), references, and related certifications in conjunction with Recommendation ITU-R M.[IMT-2020.SPECS]” is in Document 5D/TEMP/728 (only available to those who have a TIES account).

…………………………………………………………………………………………………………………………………………………………………………………………..

Synchronization of multiple IMT-2020 TDD networks:

This meeting received two input documents and continued the discussion. It was decided to carry forward all the input documents and to continue the work at the WP 5D #34 meeting in February 2020 (see Objectives for meeting #34 below).

…………………………………………………………………………………………………………………………………………………………………………………………..

Documents for consideration by WP 5D closing plenary:

The following documents were agreed by WG Technology Aspects and were provided to WP 5D closing plenary for approval.

  1. Draft IMT-2020/VVV − Process and the use of Global Core Specification (GCS), references and related certifications in conjunction with Recommendation ITU R M.[IMT-2020.SPECS]
  2. Draft IMT-2020 document − Detailed schedule for finalization of the first release of new Recommendation ITU-R M.[IMT-2020.SPECS] “Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications-2020 (IMT-2020)”
  3. Liaison statement to External Organizations on the detailed schedule for finalization of the first release of new Recommendation ITU-R M.[IMT‑2020.SPECS]
  4. Liaison statement to 3GPP proponent concerning the time interval to provide transposing references for IMT 2020
  5.  Many more documents, which are beyond the scope of the IEEE Techblog

…………………………………………………………………………………………………………………………………………………………………………………………..

Objectives for the ITU-R WP 5D meetings #33 and #34:

I. The next ITU-R WP 5D meeting #33, scheduled to be held in December 2019, will be entirely focused on the activities of the Technology Aspects Working Group. It should be noted that neither the General Aspects Working Group nor the Spectrum Aspects Working Group will be in session at the 33rd meeting. The next meeting at which Working Group Spectrum Aspects will be in session will be at the 34th meeting of WP 5D scheduled to be held in February 2020.

5D meeting #33 will be a focused meeting on the following technology aspects and will include the workshop on evaluation of IMT-2020 terrestrial radio interfaces (Doc. 5D/TEMP/809):

  1. Review additional materials to be provided by the candidate IMT-2020 RIT/SRIT proponents ETSI (TC DECT) and DECT Forum, Nufront and TSDSI, per the agreed way forward at the 32nd WP 5D meeting with regard to their respective submissions;
  2. Review of external activities in Independent Evaluation Groups through interim evaluation reports.
  • Continue work on revision of Recommendation ITU-R M.1457-14

Note: SWG Out of band emissions and SWG Radio Aspects will not have any session at the WP 5D #33 meeting. Contributions to the respective work items would be considered at the WP 5D #34 meeting.

II. The key objectives of the Technology Aspects WG for the 34th ITU-R WP 5D meeting:

  1. Review of external activities and evaluation reports of Independent Evaluation Groups. Complete evaluation reports summary (IMT-2020/ZZZ).
  2. Continue the work on “Over-the-air (OTA) TRP field measurements for IMT radio equipment utilizing AAS” based on the requested response from 3GPP and expected input from other organisations and administrations.
  • Continue work on revision of Recommendation ITU-R M.1457-14.
  • Continue work on synchronization of multiple IMT-2020 TDD networks.

Special Details About WP 5D Meeting #33 – December 2019:

This is a focused Technology Aspects Working Group meeting on the conclusion of Step 3, continuation of Step 4, and the evaluation of IMT-2020 submitted candidate technologies including a Workshop, and related matters.  Sessions of the meeting of the Working Groups and their SWGs in WP 5D meeting #33 are:

Working Groups/SWGs
Technology Aspects IN SESSION
SWG COORDINATION

SWG EVALUATION

SWG IMT SPECIFICATIONS

IN SESSION
General Aspects NOT in session
Spectrum Aspects NOT in Session
Ad Hoc Workplan IN SESSION –

ONLY for matters directly related to the Technology Aspects WG

……………………………………………………………………………………………………………………………………………………………………………..

Appendix I:  High-level scopes for Working Party 5D working and Ad hoc Groups:

Group Scope Chairman
WG GENERAL ASPECTS –    To develop deliverables on services, forecasts, and also convergence of services of fixed and mobile networks which take account the needs of end users, and the demand for IMT capabilities and supported services. This includes aspects regarding the continued deployment of IMT, other general topics of IMT and overall objectives for the long-term development of IMT. To update the relevant IMT Recommendations/Reports.

–    To ensure that the requirements and needs of the developing countries are reflected in the work and deliverables of WP 5D in the development of IMT. This includes coordination of work with ITU-D Sector on deployments of IMT systems and transition to IMT system.

K.J. WEE

Korea

WG TECHNOLOGY ASPECTS –    To provide the technology related aspects of IMT through development of Recommendations and Reports. To update the relevant IMT‑2000 and IMT-Advanced Recommendations.  To work on key elements of IMT technologies including requirements, evaluation, and evolution. To develop liaison with external research and standardization forums, and to coordinate the external and internal activities related to the IMT-2020 process.

–    To manage the research topics website and its findings.

H. WANG

China

WG SPECTRUM ASPECTS –    To undertake co-existence studies, develop spectrum plans, and channel/frequency arrangements for IMT. This includes spectrum sharing between IMT and other radio services/systems coordinating as appropriate with other Working Parties in ITU-R. A. JAMIESON

New Zealand

AD HOC WORKPLAN –    To coordinate the work of WP 5D to facilitate efficient and timely progress of work items. H. OHLSEN

Sweden

 

Appendix II: Work with involved organizations, including research entities:

The strategy for ITU-R WP 5D going forward is to gather information from the organizations involved in the global research and development and those that have an interest in the future development of IMT and to inform them of the framework and technical requirements in order to build consensus on a global level.

ITU-R WP 5D can play an essential role to promote and encourage these research activities towards common goals and to ensure that information from the WP 5D development on the vision, spectrum issues, envisioned new services and technical requirements are widespread among the research community. In the same manner, WP 5D encourages inputs from the external communities involved in these research and technology developments.

It is evident that continuing dialogue between the ITU and the entities taking part in research is a key to the continuing success of the industry in advancing and expanding the global wireless marketplace.

Working Party 5D, as is the case with all ITU organizations, works from input contributions submitted by members of the ITU. In order to facilitate receipt of information from external entities who may not be direct members of ITU, the Radiocommunication Bureau Secretariat may be considered as the point of interface, in accordance with Resolution ITU-R 9‑5.

The following major activities are foreseen to take place outside of the ITU, including WP 5D, in order to successfully complement the WP 5D work:

–Research on new technologies to address the new elements and new capabilities of IMT‑2020;

–Ongoing development of specifications for IMT and subsequent enhancements.

Appendix III: Agreed overall deliverables/work plan of WP 5D and technical requirements in order to build consensus on a global level:

The following table provides the schedule of when approval of the planned major deliverables will be achieved following the procedures of WP 5D.

Date Meeting Anticipated Milestones
December 2019 Geneva WP 5D #33

(max. 4 day meeting)

•     Focus meeting on evaluation – review of external activities in Independent Evaluation groups through interim evaluation reports

•     Workshop on evaluation of IMT-2020 terrestrial radio interfaces

February 2020 [TBD] WP 5D #34 •     Finalize Doc. IMT-2020/ZZZ Evaluation Reports Summary

•     Finalize Addendum 5 to Circular Letter IMT‑2020

•     Finalize draft new Report M.[IMT.AAS]

•     Finalize draft new Report ITU-R M.[HAPS-IMT]

•     Finalize draft new Report ITU-R M.[IMT.1 452-1 492 MHz]

•     Finalize draft new Report ITU-R M.[IMT.MS/MSS.2GHz]

•     Further update/Finalize draft new Report/Recommendation ITU-R
M.[IMT.1518 MHz COEXISTENCE]

June 2020 [TBD] WP 5D #35 •     Finalize draft new Report ITU-R M.[IMT-2020.OUTCOME]

•     Finalize Addendum 6 to Circular Letter IMT‑2020

October 2020 [TBD] WP 5D #36 •     Finalize Addendum 7 to Circular Letter IMT‑2020 (if needed)

•     Finalize revision 15 of Recommendation M.1457

November 2020 Geneva WP 5D #36bis

(3 day meeting)

•     Finalize draft new Recommendation ITU-R M.[IMT‑2020.SPECS]

•     Finalize Addendum [7/8] to Circular Letter IMT‑2020

Appendix IV: Detailed workplan for the development of a working document towards a preliminary draft new Report ITU-R M.[IMT-2020 BROADBAND REMOTE COVERAGE]:

Source:       Document 5D/TEMP/760 (Ericsson)

Title “IMT-2020 for remote sparsely populated areas providing high data rate coverage”
Identifier M.[IMT-2020 TERRESTRIAL BROADBAND REMOTE COVERAGE]
Document type Report
WP 5D Lead Group WG Technology Aspects
SWG Chair Marc Grant, AT&T
Editor <TBD>
Focus for scope and work This Report provides details on prospects associated with provisioning of enhanced mobile broadband services to remote sparsely populated and under-served areas proposing enhancements of user equipment as well as for networks in suitable frequency bands:

−    for user equipment, possible solutions based on affordable user deployed RF amplifier equipment combined with access to local spectrum could be considered and examined; and

−    for networks, possible solutions based on high gain massive MIMO antennas could be reviewed.

Related documents Question ITU-R 77-7/5 − “Consideration of the needs of developing countries in the development and implementation of IMT”

Question ITU-R 229-4/5 − “Further development of the terrestrial component of IMT”

Milestones Meeting No. 32 (9-17 July 2019, Búzios, Brazil)

1    Call for contributions in the WP 5D Chairman’s Report.

Meeting No. 33 ([10-13 December 2019, Geneva, Switzerland])

1    [No sessions scheduled].

Meeting No. 34 (19-26 February 2020, <TBD>)

1    Consider received contributions.

2    Draft liaison statements as required.

3    Produce working document.

3    Review and revise the detailed workplan as required.

Meeting No. 35 (24 June – 1 July 2020, [China]))

1    Consider the received contributions.

2    Consider any necessary liaison statements.

3    Elevate the working document to a preliminary draft new Report.

4    Review and revise the detailed workplan as required.

Meeting No. 36 (7-14 October 2020, [India])

1    Consider the received contributions.

2    Consider any necessary liaison statements.

3    Elevate the preliminary draft new Report to a draft new Report for submission to Study Group 5.

 

…………………………………………………………………………………………………

Update- Addendum 4 to Circular Letter 5/LCCE/59 24 July 2019:

To Administrations of Member States of the ITU, Radiocommunication Sector Members, ITU-R Associates participating in the work of Radiocommunication Study Group 5 and ITU Academia

Subject:  Acknowledgement of IMT-2020 proposals, future plans and evaluation report requests

Evaluation Workshop:
WP 5D will hold a Workshop on “IMT-2020 Terrestrial Radio Interfaces Evaluation” from 10 to 11 December, 2019 during its 33rd meeting to provide an interactive discussion among IEGs, proponents and WP 5D delegates.

The workshop will be held at the same venue as the 33rd meeting of WP 5D. The program of the workshop and detailed information about the workshop registration can be found on the “Web page for IMT-2020 submission and evaluation process” (under “Workshop on IMT-2020 Terrestrial Radio Interfaces Evaluation”). Parties interested in the details of the workshop (program, registration deadline, etc.) are kindly requested to check the workshop website periodically before the 33rd WP 5D meeting.

Evaluation Group discussion area:
The Evaluation Group discussion area can be found on “Web page for IMT-2020 submission and evaluation process.”

This discussion area is to exchange views on the characteristics of the proposed radio interface(s) technologies submitted by proponents and to discuss evaluation related issues among IEGs and the proponents.

The discussion area is available on a subscription basis for ITU-R members, designated representatives of the proponents of candidate technology submissions and designated representatives of the IEGs. Focal points of both the proponents and IEGs are requested to provide details of the designated representatives. IEGs and proponents are encouraged to participate in the Evaluation Group discussion area, and share the experiences that might be helpful to progress the evaluation activities.

Request for evaluation reports:
Following the IMT-2020 process on “Submission/Reception of the RIT and SRIT proposals and acknowledgement of receipt” in accordance with Document IMT-2020/2(Rev.2), WP 5D started the evaluation process from its 31st meeting in October 2018, and will last until its 34th meeting in February 2020.

Therefore, WP 5D expects to receive the final evaluation reports from the Independent Evaluation Groups on those IMT-2020 candidate technology RIT(s)/SRIT(s) that have been evaluated by its 34th meeting. While WP 5D kindly requests the independent evaluation groups to provide an interim
evaluation report for its 33rd meeting in December 2019 in which the Workshop on IMT-2020 evaluation will also be held.  It is also suggested that the evaluation reports contain information including the use of Report ITU-R M.2412, the considered test environment(s), the evaluated RIT(s)/ SRIT(s), and the evaluation results as requested by the compliance templates, but not limited to those. It is also requested that the interim evaluation report includes as much detail about the evaluation as possible.

Revision to Document IMT-2020/2:
Revision 2 to Document IMT-2020/2 “Submission, evaluation process and consensus building for IMT-2020”, is now available on “IMT-2020 documents”. This revision contains an additional WP 5D meeting planned in November 2020 to complete the Recommendation for detailed specifications of radio interface technologies for the terrestrial components of IMT-2020.

Updates to the ITU-R web page for the IMT-2020 submission and evaluation process and IMT-2020 documents Any future changes to the submission and evaluation process will be announced in Addenda to this
Circular Letter. Other information, such as information on the Workshop on IMT-2020 Terrestrial Radio Interfaces Evaluation, and interim evaluation report(s) will be updated dynamically on the “Web page for IMT-2020 submission and evaluation process” and “IMT-2020 documents.”

Consequently, Members and Sector members interested in the IMT-2020 development process including evaluation activities are kindly requested to periodically check the website.

Mario Maniewicz
Director

 

Verizon and AT&T want to virtualize the 5G Network Core and use Mobile Edge Computing

Verizon:

As we reported earlier this week, Verizon announced the first deployment of it’s mobile 5G network with Chicago and Minneapolis going live on April 11. The nation’s largest mobile network operator says the service will be available in “select areas” in those markets, and it plans to bring an additional 30 markets online later this year.

Verizon engineers have been preparing for 5G by migrating network core and edge processing functions from the physical world to the virtual world for about three years now, said Adam Koeppe, SVP of network planning at Verizon.  “Today, in the (proprietary) 5G network that we’ve already launched in our four 5G Home markets (FWA), those software functions that are used for the core of the 5G network are 100 percent virtual. Unlike LTE where you had to start physical and move to virtual, they’re native 5G network functions, those all start as virtual,” said Koeppe.

Similar to other carriers’ 5G roadmaps, Verizon’s initial pre-standard 5G deployments are based on 3GPP Release 15 NR NSA (non-standalone) architecture.  It’s using parts of the 4G network core (EPC) and signaling with a 5G radio access network for the data plane.   “All those functions in that path for 5G are virtual regardless of whether they’re 4G core that you’re using to support 5G or native to 5G functions,” Koeppe said.

“We’re trying to get the processing capabilities required on a network session as close to the consumer as possible, and the reason for that is one of the promises and realities of 5G is that you have the ability to have much lower network latency,” he said. Multi-access edge compute equipment (MEC) and network slicing are key components of that effort. “You have to make fundamental architectural changes to how your core works if you want to provide very low-latency services.”

Verizon currently manages different network use cases manually, by identifying the class of service for each device running on its wireless network. Network slicing and virtualization would change that significantly, and software plays a critical role, Koeppe said. “All the network functions that are providing that service need to be virtualized, because I can’t autonomously spin up physical capacity. That has to be done by a person. But if it’s virtual capacity I can spin that up from a machine through orchestration and machine learning.”

When you have 15 to 20 different use cases, “you have a very sophisticated network that is all virtualized and all programmable. Some of that you physically just can’t do with LTE today. Much of those 5G use cases will rely on that type of programmability of your network and you can’t do that without having a virtualized network function,” Koeppe added.

Verizon wants to put the capabilities of its 5G network and the MEC network into the hands of innovators who can drive use cases beyond what’s possible with 4G today, according to Koeppe. “These are radically different network capabilities, a lot goes in to ensuring that the hardware and the software works well together. And that’s the phase we’re in right now with our deployment.”

…………………………………………………………………………………………………………………………………………………………………………………………………………………………..

ITU-T Standards status of network softwarization:

Question 21 of ITU-T SG13 is studying network softwarization including: network slicing, SDN, and orchestration which are highly expected to contribute to IMT-2020.  Question 21 met during the SG13 meeting, from 4 to 14 March 2019 at Victoria Falls, Zimbabwe under the chairmanship of co-Rapporteur Ms.Yushuang Hu (China Mobile, China) and Mr. Kazunori TANIKAWA (NEC, Japan).

On March 14, 2019, ITU-T SG13 has consented to two new Recommendations:

  1. ITU-T Y.IMT2020-ML-Arch “Architectural framework for machine learning in future networks including IMT-2020” (Ref. SG13-TD355/WP1)
  2. ITU-T Y.3115 (formerly Y.NetSoft-SSSDN). It describes SDN control interfaces for network slicing, which especially focuses on the control of front haul networks such as PON.

…………………………………………………………………………………………………………………………………………………………………………………………………………………………..

AT&T:

AT&T is on a similar path with virtualized network functions and MEF.  According to Light Reading, AT&T has virtualized 65% of its core network during the past five years, and is on track to meet its goal of virtualizing 75% of its network functions by the end of 2020.

“We see the cloud fragmenting again and certain workloads being pushed out to the edge — at customer [premises] and in the network — with more heavy-duty storage, and the back end being in the centralized cloud,” Roman Pacewicz, AT&T Business’s chief product officer, told Light Reading during an interview conducted at MWC 2019 in Barcelona.

Nowhere is [virtualization] more important than in our rollout of 5G,” Pacewicz says. “If we didn’t have a network edge cloud environment that takes the mobile core out to the edge of the network, those deployments would be complicated and longer. The whole strategy of virtualization and cloudification of the network (see IEEE Techblog posts on ITU-T SG13 recommendations related to IMT 2020) becomes more important in upgrading the infrastructure to 5G, because everything is virtualized and software-enabled.”

A new generation of services enabled by 5G will require low latency, and therefore require compute and storage resources close to the edge of the network, Pacewicz says.  That’s where MEC comes in to play a huge role in 5G (as well as real time critical IoT applications).  We previously reported that AT&T has a joint project with Microsoft to deliver Microsoft Azure cloud services from the AT&T network edge. The goal is reduced latency and increased network resiliency.  For applications such as AI, mixed reality and augmented reality, latency needs to be no greater than 20 milliseconds and that requires data to be processed closer to the edge of the network and closer to the end user, Pacewicz says.

A retailer with 8,000–10,000 stores can’t have dedicated compute at every site, but needs low latency to create new types of experience and networks need 2 millisecond latency for safe interactions between robots and human beings, Pacewicz claims.

–>Of course latency includes the mobile access network, mobile packet core, and edge network.  We are a very long way from achieving 20 milliseconds one way latency let alone round trip!

AT&T is teaming with Israeli startup Vorpa on projects to monitor the location of drones around sensitive locations such as aircraft and airports, alert authorities if they’re flying in restricted areas, and identify the location of a drone’s controller. Those types of applications require low latency enabled by mobile edge computing, Pacewicz says.  He concluded the Light Reading interview by highlighting SD-WAN is a key part of making the network more intelligent and flexible to accommodate 5G applications by optimizing traffic routing, particularly as edge devices don’t just consume data, but also generate lots of data.

–>While the SD-WAN market is growing, there are no standard definitions, interfaces or any specs for UNI or NNI interoperability.

AT&T’s CFO John Stephens said that several trends are conspiring to potentially lower AT&T’s CAPEX. He cited the company’s move to network functions virtualization (NFV) and software-defined networking (SDN), which are technologies intended to replacing expensive, proprietary vendor hardware/equipment with less expensive, software-powered equivalents that run on commodity compute servers, white boxes and bare metal switches. Stephens said that more than half of AT&T’s network functions have been virtualized, and that the company remains on track to reach its goal of virtualizing fully 75% of its network functions by 2020.  “All of this leads to an efficiency opportunity on a going forward basis,” he said.

References:

https://www.sdxcentral.com/articles/news/how-verizon-is-using-software-to-power-its-5g-network/2019/03/

https://www.lightreading.com/cloud/atandts-pacewicz-we-see-the-cloud-fragmenting-again/d/d-id/750150

ITU-T SG13 Non Radio Hot Topics and Recommendations related to IMT 2020/5G

 

 

3GPP RAN WG meeting in Taiwan: January 21 – 25, 2019: NTT DOCOMO’s URLLC Use Cases

3GPP RAN WG meeting in Taiwan: January 21 – 25, 2019:

A five-day working group meeting of the 3rd Generation Partnership Project (3GPP) RAN WG opened in Taiwan on Monday January 21, 2019, with 459 registered delegates attending.   The goal of the meeting is to progress 3GPP Release 16 which will include an important IMT 2020 Use Case:  Ultra-Reliable Low-Latency Communications (URLLC).  I counted over a dozen contributions on the URLLC topic at this 3GPP meeting’s document list which can be accessed here.

Services for latency sensitive devices for applications like factory automation, autonomous driving, and remote surgery. These applications require sub-millisecond latency with error rates that are lower than 1 packet loss in 10⁵ packets [ITU-R M.2410.0]. New techniques need to be devised to meet the stringent latency and reliability requirements for URLLC.

 

An interesting 3GPP RAN meeting contribution on Views and evaluations for URLLC scenarios by Kazuaki Takeda of NTT DOCOMO will be presented this week.  In that contribution, NTT DOCOMO selected the following cases for evaluation:

Case Use-case Reliability Latency Data packet size and traffic model Description
1 Factory automation

@ 30GHz

99.9999 (%) 2ms for end-to-end

1ms for air-interface

DL & UL: 32 bytes

Periodic and deterministic traffic model with data arrival interval 2ms

Motion control
2 Factory automation

@ 4GHz

99.9999 (%) 2ms for end-to-end

1ms for air-interface

DL & UL: 32 bytes

Periodic and deterministic traffic model with data arrival interval 2ms

Motion control
3 Rel.15 enabled use-case in indoor hotspot

@ 4GHz

99.9 (%) 7ms for air-interface DL & UL: 4096 bytes

FTP model 3

AR/VR
4 Rel.15 enabled use-case in urban macro

@ 4GHz

99.999 (%) 1ms for air-interface DL & UL: 32 bytes

FTP model 3

Sporadic traffic
5 Power distribution

@ 700MHz

UL/DL SINR CDF only

 

There are high interests on supporting industrial IoT type of services at local area using carrier frequencies of around 4GHz and 30GHz [2]. It would be possible to evaluate NR performance in this type of scenario by simulating case 1, case 2, and case 3. For AR/VR type of services in a specific local area, it is not sure whether all the packets should be delivered as URLLC packets, or some specific type of packets (e.g., control packet) for AR/VR service should only be delivered as URLLC packets (i.e., other types of packets for AR/VR service can be delivered as eMBB). The simple way is to treat all the packets as URLLC packets as the evaluation assumption. Case 3 can be viewed as representing such situation. For emergency type of services in wide area, it can be represented by case 4. As the case 5, we partly evaluate the wide area performance at 700MHz.

…………………………………………………………………………………………………………………………………………………………………..

Taiwan 5G Commercialization Summit

In conjunction with the referenced 3GPP working group meeting, the Taiwan 5G Commercialization Summit organized by Taiwanese entities was also held in Taipei on Monday, January 21st.  The organizers of the Taiwan 5G summit were: MediaTek, Chunghwa Telecom, the Taiwan Association of Information and Communications Standards, and the 5G Office of the Ministry of Economic Affairs (MOEA). Tung Tzu-hsien (童子賢), the head of iPhone assembler Pegatron Corp and a private sector group advising the government’s national innovation/new economy task force, said 5G technology is expected to drive sophisticated applications of the future such as smart medical care and the Internet of Vehicles.  Many of those new applications will require URLLC.

Mr. Tung urged the Taiwan government to update regulations to meet the needs of a fast-changing telecom environment and prevent Taiwan from lagging behind other countries in 5G development.  As long as Taiwan is successful in 5G development, it will create major commercial opportunities for the local Information and Communications Technology (ICT) sector, he added.

Since January 2018, Chunghwa Telecom has teamed up with the MOEA’s 5G Office, and the government-sponsored Institute for Information Industry (III) and Industrial Technology Research Institute in a 5G development alliance.

Page 2 of 2
1 2