Introduction:

When completed, Recommendation ITU-R M.[IMT-2020.SPECS] will contain the detailed specifications of the radio interfaces of IMT-2020. The structure and philosophy adopted for M.[IMT-2020.SPECS] for IMT2020 is based on those used in Recommendations ITU-R M.1457 for IMT-2000 and ITU-R M.2012 for IMT-Advanced, which have been successfully utilized for two decades through numerous revisions of Recommendations ITU-R M.1457 and ITU-R M.2012.

A key concept is the continued use of the Global Core Specification (GCS) provided by the GCS Proponent and references to standards of Transposing Organization(s) [1.] authorized by the GCS Proponent whereby the detailed standardization is undertaken within the Transposing Organization that operates in concert with the RIT/SRIT Proponent and/or GCS Proponent entities.

The relationship between the GCSs for IMT-2020 radio interface technologies and the corresponding transposed standards is such that the GCSs are the framework for their corresponding detailed transposed specifications. Recommendation ITU-R M.[IMT-2020.SPECS] may also include references to specific related standards of the Transposing Organizations. There may be one or more entities that exist within a GCS Proponent for a given GCS.

It is also permissible to not have a separate GCS for a particular radio interface technology, in which case all the detailed specifications of that particular radio interface technology (the Directly Incorporated Specification1) would be fully contained directly within the Recommendation ITU-R M.[IMT-2020.SPECS].

This understanding of whether a GCS would or would not be utilized in the context of a particular radio interface technology within Recommendation ITU-R M.[IMT-2020.SPECS] is necessary so that the proper structure and content of the Recommendation is chosen to properly reflect the technology specifications.

Consequently, the RIT/SRIT Proponent is requested to indicate at an early stage to the ITU-R its preliminary intention to submit a Global Core Specification, in advance of the required formal certifications, which will be used to form the basis of information in the Recommendation ITU‑R M.[IMT-2020.SPECS].

The ITU-R (Working Party 5D) will review any GCS or DIS submission(s) and agree/approve or suggest changes in conjunction with the development and the ultimate approval by ITU-R of the final published version of Recommendation ITU-R M.[IMT-2020.SPECS] and the established schedules.

ITU-R (WP 5D and/or the Radiocommunication Bureau) will maintain liaison with the relevant External Organizations (RIT/SRIT Proponents, GCS Proponents, and Transposing Organizations) on the required deliverables and also the relevant schedules and administrative matters associated with the various stages of the development of the Recommendation ITU‑R M.[IMT-2020.SPECS] and its revisions over time.

………………………………………………………………………………………………………………………………………..

ITU-R WP 5D will review any GCS or DIS submission(s) and agree/approve or suggest changes in conjunction with the development and the ultimate approval by ITU-R of the final published version of Recommendation ITU-R M.[IMT-2020.SPECS] and the established schedules.

ITU-R (WP 5D and/or the Radiocommunication Bureau) will maintain liaison with the relevant External Organizations (RIT/SRIT Proponents, GCS Proponents, and Transposing Organizations) on the required deliverables and also the relevant schedules and administrative matters associated with the various stages of the development of the Recommendation ITUR M.[IMT-2020.SPECS] and its revisions over time.

Respecting the integrity of the GCSs and ensuring that the transposed standards are consistent with the GCS:

To assure users of Recommendation ITU-R M.[IMT-2020.SPECS] of the integrity of the GCS for a particular technology, and to ensure that the transposed standards are consistent with the common globally agreed vision of IMT-2020, completeness and traceability of the GCS and the transposed standards is a foremost obligation of the ITU-R.

As noted above, the IMT-2020 specifications could be developed around a “Global Core Specification” (GCS), which is related to externally developed materials incorporated by specific references for a specific technology. The submitted GCSs as accepted by WP 5D for inclusion in Recommendation ITU-R M.[IMT-2020.SPECS] will be placed on the relevant ITU website and indicated by hyperlinks in each relevant technology Section of Recommendation ITU-R M.[IMT2020.SPECS].

The GCS provided by the GCS Proponent would form the nucleus of Recommendation ITUR M.[IMT-2020.SPECS]. For each radio interface technology in Recommendation ITU-R M.[IMT2020.SPECS] (whether presented as a single RIT or as one of the component RITs within an SRIT) there will be only one corresponding GCS. A GCS will have one or more GCS Proponents. Each component RIT within a SRIT may be separately addressed with regard to its GCS and the associated GCS Proponents.

Each GCS would correspond to separate sets of transposed standards/specifications from one or more individual standards development organizations or equivalent entities. For each separate set of transposed standards/specifications, there will be only one Transposing Organization.

The referenced standards of the authorized Transposing Organizations [1.] must be technically consistent with the corresponding GCS while allowing a limited amount of flexibility to accommodate, e.g. minimal regional differences. An example of a regional difference would be a regional adjustment for differing frequency bands. Adherence to this format and principle assures a common global standard for IMT-2020 as codified in Recommendation ITU-R M.[IMT2020.SPECS] including the external materials incorporated by reference.

The receipt of information with regard to Recommendation ITUR M.[IMT-2020.SPECS] that is related to a business relationship of the ITU and the relevant external organizations complements and support activities such as the technical work under the purview of the relevant Study Group within the ITU. It must be noted that where this document addresses administrative matters it does not intend to usurp the Study Group or Working Party authority but merely seeks to provide additional critical information to the deliberations on Recommendation ITU-R M.[IMT-2020.SPECS] as to the individual or collective intent and/or actions of the RIT/SRIT Proponents, GCS Proponents, and/or Transposing Organizations that support a particular technology, a corresponding GCS, and the related transposed standards.

NOTE 1.  A Transposing Organization is an individual entity authorized by a GCS Proponent to transpose the relevant GCS into specific standards and to provide specific references and hyperlinks (Transposition References) for the purposes of Recommendation ITU-R M.[IMT-2020.SPECS].  A Transposing Organization:

1) must have been authorized by the relevant GCS Proponent to produce transposed standards for a particular technology, and
2) must have the relevant legal usage rights.

………………………………………………………………………………………………………………………………………………………………………….

It is noted that the entity or entities that make up a GCS Proponent may also be a Transposing Organization. It should also be noted that the term Transposing Organization is always indicated to be a single entity. It is also noted that, for the purposes of Recommendation ITU-R M.[IMT-2020.SPECS], the ITUR will only recognize as valid those Transposing Organizations that have been identified to the ITU-R by the GCS Proponent as authorized to transpose the GCS Proponent’s GCS.

Neither a GCS Proponent nor a Transposing Organization need to be a formal “Standards Development Organization” or “SDO.” For example, “SDO” here could represent an industry entity, organization, individual company, etc. that, if applicable, also qualifies appropriately under the auspices of Resolution ITU-R 9.

…………………………………………………………………………………………….

References:

https://www.itu.int/md/R15-IMT.2020-C-0020/en

https://www.itu.int/pub/R-RES-R.9

 

3 thoughts on “IMT 2020: Concept of Global Core Specification (GCS) and Transposing Organization(s)

  1. Update from ATIS (U.S. rep for 3GPP in ITU-R WP 5D) on 3GPP Release 16:

    LIAISON STATEMENT FROM 3GPP PROPONENT REGARDING IMT-2020 TRANSPOSITION TIMINGS IN STEP 8 OF IMT-2020 PROCESS

    3GPP asks WP 5D in this liaison if WP 5D could review its year-end 2020 schedule for IMT-2020 to provide some additional time for the provision of the transposed standards URL references to ITU-R for finalization of the new Recommendation ITU-R M.[IMT-2020.SPECS].

    Adjustment to the 3GPP Release 16 Schedule:
    In RAN Plenary #82, 3GPP amended the development schedule for 5G Release 16 to better reflect the complexities of the technology specifications development work. This was done in order to properly facilitate the sequencing of work between 3GPP RAN working groups for overall specification stability. Annex 1 shows this amended Release 16 schedule.

    Global Core Specification (GCS) for IMT-2020 process Step 8:
    3GPP plans to use the June 2020 specification output from the 3GPP Plenaries. In particular, the output of RAN #88 (15-18 June 2020), when Release 16 ASN.1 freeze milestone is concluded, will be the primary basis of the IMT-2020 separate GCSs that correspond to the 3GPP submissions of the NR RIT (Releases 15 & 16) and the LTE/NR SRIT (Releases 15 & 16)2. These specifications will establish the primary basis of the Global Core Specification (GCS) that the 3GPP GCS Proponent will provide to ITU-R WP 5D in time for the WP 5D Meeting #35 (24 June -1 July 2020). This is in anticipation of the detailed ITU-R schedule for IMT-2020 Step 8.
    The approved June 2020 version of the 3GPP specifications will be used by the 3GPP Transposing Organizations (TOs) for their individual standards transpositions, and for the creation of the relevant URL references to be provided to ITU-R for inclusion in the draft new Recommendation under Step 8 of the IMT-2020 process. It is expected that the published versions of the specifications from the June 2020 Plenary will be available to the Organizational Partners (OPs) by 6 July 2020 to initiate their transposition work.

    Anticipation of Schedules:
    While the normal detailed sequencing schedule used in IMT technology Recommendations for IMT-2020 Step 8 has not yet been communicated officially (via liaison) to the External Organizations by WP 5D, the 3GPP TOs have considered the usual milestones of the IMT process in their work planning analysis, assisted by consultations with the ITU-R WP 5D Chairman and the Chair of the WP 5D Work Plan Ad Hoc group.
    Based on a typical schedule for the URL references for ITU-R IMT technology Recommendations, the URL references for IMT-2020 need to be supplied by the TOs to ITU-R approximately 30 days ahead of the planned WP 5D Meeting #36 (7-14 October 2020). This lead time is needed in order for the Radiocommunication Bureau to compile all the TOs’ references and tables into the final draft version for all technologies included in Step 8 in time for WP 5D Meeting #36. The deadline for these URL references and related information to be sent to the Radiocommunication Bureau by the TOs would thusly be expected to be planned for 7 September 2020 by the ITU-R. WP 5D will conclude the draft Recommendation ITU-R M.[IMT-2020.SPECS] in its Meeting #36 and forward it to ITU-R Study Group 5 for initiating final ITU-R approval.
    …………………………………………………………………………………………………………………………..
    3GPP notes that with the complexities of 5G as a new generation of technology and the importance of the new Recommendation ITU-R M.[IMT-2020.SPECS] globally for all stakeholders (including support for the results of WRC-19), any additional time afforded to the External Organizations in Step 8 for provision of the URL references would be of great benefit to all the radio interface technology proponents, not just 3GPP.
    3GPP welcomes any accommodation WP 5D might make concerning the scheduling of the work to conclude the first release of Recommendation ITU-R M.[IMT-2020.SPECS] and kindly asks for feedback to 3GPP from that discussion.
    ……………………………………………………………………………………………………………………………..
    Annex 1. 3GPP has agreed revised completion dates for Release 16 – schedule shifted out by 3 months:
    Release 16 RAN-1 Freeze RAN # 86 December 2019
    Release 16 RAN Stage 3 Freeze RAN # 87 March 2020
    Release 16 ASN.1 Freeze RAN # 88 June 2020
    Release 16 RAN-4 Freeze RAN # 89 September 2020
    ……………………………………………………………………………………………………………………………….
    Submitted on behalf of the 3GPP Proponent of the 3GPP submission, which is collectively the 3GPP Organizational Partners (OPs). The 3GPP OPs are ARIB, ATIS, CCSA, ETSI, TSDSI, TTA and TTC (http://www.3gpp.org/partners

  2. Draft IMT-2020/VVV Process And The Use Of Global Core Specification (GCS), References And Related Certifications In Conjunction With Recommendation ITU-R M.[IMT-2020.SPECS]:

    The relationship between the GCSs for IMT-2020 radio interface technologies and the corresponding transposed standards is such that the GCSs are the framework for their corresponding detailed transposed specifications. Recommendation ITU-R M.[IMT-2020.SPECS] may also include references to specific related standards of the Transposing Organizations. There may be one or more entities that exist within a GCS Proponent for a given GCS.

    It is also permissible to not have a separate GCS for a particular radio interface technology, in which case all the detailed specifications of that particular radio interface technology (the Directly Incorporated Specification1) would be fully contained directly within the Recommendation ITU-R M.[IMT-2020.SPECS].
    This understanding of whether a GCS would or would not be utilized in the context of a particular radio interface technology within Recommendation ITU-R M.[IMT-2020.SPECS] is necessary so that the proper structure and content of the Recommendation is chosen to properly reflect the technology specifications.

    Consequently, the RIT/SRIT Proponent is requested to indicate at an early stage to the ITU-R its preliminary intention to submit a Global Core Specification, in advance of the required formal certifications, which will be used to form the basis of information in the Recommendation ITU‑R M.[IMT-2020.SPECS].

    ITU-R (Working Party 5D) will review any GCS or DIS submission(s) and agree/approve or suggest changes in conjunction with the development and the ultimate approval by ITU-R of the final published version of Recommendation ITU-R M.[IMT-2020.SPECS] and the established schedules.

    ITU-R (WP 5D and/or the Radiocommunication Bureau) will maintain liaison with the relevant External Organizations (RIT/SRIT Proponents, GCS Proponents, and Transposing Organizations) on the required deliverables and also the relevant schedules and administrative matters associated with the various stages of the development of the Recommendation ITU‑R M.[IMT-2020.SPECS] and its revisions over time.

  3. At it’s Dec 11-13, 2019 meeting in Geneva, ITU-R WP 5D SWG Evaluation/WG Technology Aspects has determined that 3GPP, China, Korea, TSDSI (India), ETSI/DECT Forum and Nufront IMT 2020 RIT self evaluations were complete as per IMT-2020 Process Step 3.

    That result progresses IMT 2020 RITs from TSDSI, ETSI-DECT Forum, Nufront (still some issued with this one) which were said to be incomplete at the previous WP 5D meeting (#32) as per this text:

    “Working Party 5D (WP 5D) has so far identified at WP 5D meeting #32, in its review of the Proponent (TSDSI/ETSI-DECT Forum/Nufront), some submission deficiencies and clarification of technology issues which impact the submission and the ability of WP 5D to have the submission move forward in the IMT-2020 process. The proponent had been requested in the discussions in WP 5D meeting #32 to remedy the deficient information.”

    “This submission cannot, in its current form, be determined to have satisfactorily fulfilled Section 4.3 for the self-evaluation. The supplied self-evaluation and any amendments accepted during WP 5D meeting #32 for TSDSI RIT do not yet permit WP 5D to determine if a complete and satisfactory self-evaluation as required by the IMT-2020 process has been fully provided.
    The Proponent should provide the full details requested in the process and in the specifically defined way to WP 5D, considering the comments raised in WP 5D meeting #32, in order for WP 5D to proceed further in the process with this submission”
    ………………………………………………………………
    Note that ATIS and 5GMF (Japan) stated that China and Korea IMT 2020 IMT 2020 RIT submissions are technically identical to 3GPPs which is based on 3GPP Release 15 (for both 5G-NR and NB-IoT).